
News · January, 2026
Supervising the construction of the Viroi Bridge
Construction of the new Viroi Bridge is progressing. SRP Albanian Engineering supervises the works together with the JV SRP Schneider & Partner Ingenieur-Consult GmbH and SEED Consulting.
Located on the SH4 corridor towards the Kakavija border crossing, the new bridge is 33 metres long and 7 metres wide, with two traffic lanes and footpaths on both sides. The project aims to shorten travel times, improve safety during floods and strengthen the connection of communities in southern Albania.
As there is no alternative road in the area, the bridge will provide uninterrupted traffic all year round. More than 200,000 vehicle users and 150,000 pedestrians are expected to benefit from this investment.
More news

A realistic 3D model of Butrint Archaeological Park
“Historical heritage monuments: digital reconstruction for preservation”.

Student City 1: Commissioner Várhelyi’s visit
European Commissioner for Neighbourhood and Enlargement Olivér Várhelyi started his visit to Tirana at Student City, where he inspected the…

From the furthest house to the treatment plant
A separate wastewater network that runs down a narrow valley to a treatment plant across the lake, to reduce pollution…