Services · 01 / 03
Transport & Infrastructure
Resilient roads and bridges, aligned with SDG 9
- 1Deck: 2 lanes and footpaths
- 2Pier
- 3Pile cap and piles
- 4Abutment
1.0
Efficient and reliable transport and infrastructure are essential for economic development and connectivity. SDG 9 calls for resilient infrastructure, sustainable cities and communities, and economic growth.
We focus on sustainable transport infrastructure, from the planning to the implementation of roads and bridges. In the transport sector we prioritise three things: optimising traffic networks for efficiency and accessibility, improving traffic safety to protect communities, and minimising environmental impact for long-term sustainability.
Beyond transport, we design sustainable infrastructure for existing and new settlements: residential areas, public facilities and industrial zones. For us, infrastructure is sustainable when it is planned, designed, built, operated and decommissioned with economic and financial sustainability, social inclusion, environmental protection and institutional accountability, across its entire life cycle.
Our engineers have worked on the A3 motorway in Bavaria, the Rader high bridge over the Kiel Canal, the Dresden east route, the Hjulsta Södra interchange of the Stockholm bypass and the modular bridges over the Moust river in Mongolia. In Albania we supervised the construction of the new Viroi Bridge on the SH4 corridor towards Kakavija.
SDGAligned with Sustainable Development Goal 9: industry, innovation and infrastructure.
2.0
Roads
- Regional and statutory planning
- Preliminary and final road design
- Traffic network optimisation
- Road safety
- Noise protection and environmental impact assessment
- Ground stabilisation
- Tendering and supervision
Bridges and structures
- New and precast bridges
- Bridge investigation, rehabilitation and widening
- Noise barriers
- Structural engineering
- Construction supervision
Infrastructure and survey
- Infrastructure for residential areas, public facilities and industrial zones
- Topographic and cadastral surveys
- Digitisation and GIS databases
Case study · Gjirokastër
Viroi Bridge.
We supervised the construction of the bridge over the Viroi spring, on the SH4 corridor towards Kakavija: from the foundations in the water to the final road layers.
- Length
- 33 m
- Width
- 7 m
- Lanes
- 2