References · Water supply and sewerage · Azerbaijan
Consultancy Services for the “Open Programme Municipal Infrastructure II — Water Supply and Sewerage Network in Ganja and Sheki”, Azerbaijan
- Client
- Dornier-Schneider Consulting GmbH
- Location
- Ganja and Sheki, Azerbaijan
- Service
- Construction supervision
- Period
- December 2018 – February 2019
- Status
- Completed
- Reference no.
- 2018-001
The project
The programme is financed by the Government of Germany through KfW and comprises the reconstruction of the water supply and sewerage systems and of the treatment plants for Ganja and Sheki.
SRP Albanian Engineering provided services in the supervision of the works for the lots: Ganja WC 3 — water distribution network and black water sewers for the right-hand part of Ganja (water: 46,112 m ND 32–ND 50 and about 81,354 m ND 110–ND 500, 16 main distribution rooms; sewage: about 141,465 m corrugated HDPE pipes ND 200–ND 300, about 13,019 m ND 400–ND 600 and 8,313 wells; micro-tunneling 1.2 km); Ganja WC 4 — the same for the central part of Ganja (water: 55,964 m ND 32–ND 50 and about 132,617 m ND 110–ND 820, 24 chambers; sewage: about 143,949 m ND 200–ND 300, about 30,790 m ND 400–ND 1000, about 14,276 m concrete pipes ND 1200–ND 1600, 7,852 wells and 746 distribution chambers; micro-tunneling 1.0 km); and Ganja WC 5 — the wastewater treatment plant.
The programme also comprises the Sheki lots: the Kish River galleries (19,000 m³/day), the main transmission (2.8 km, ND 400) and two new reservoirs (2 × 1,000 m³) including chlorination; three new reservoirs of 3,000 m³ each; the replacement of the Sheki water supply and sewerage network; and the wastewater treatment plant for 79,000 inhabitants in 2035.
What we did
One engineer acting as Assistant Resident Engineer for the implementation of the supply and construction contracts in Ganja
Assistance to the Resident Engineer in the construction supervision
Full familiarisation with the contractual documents — the design, the reports, the tender documents, the drawings and the contract documentation
Reporting and correspondence with the head office and the team leader
Your project
Planning something similar?
Tell us where you stand. We will come back with the team and the first steps.
In the same sector

Municipal Infrastructure Programme (MIP) II, phase 3: water supply and sewerage for Lori and Nor Akunq, Armenia
The project concerns the rehabilitation, renewal and extension of the water supply network and urgent measures in the sewer systems…

Wastewater Development Project, Gjilan, Kosovo
The purpose of the project is the collection and treatment of all the wastewater in the urban area of Gjilan…

Preparation of the Feasibility Study for the project “Sewage Disposal in Kosovo I/II”
Within the framework of the bilateral cooperation, the Federal Republic of Germany has committed grant funds of 13.4 million euros…