Detailed Design for the Water Supply Systems for Berat Municipality (Ref. REF-57923-05-12-2020) — Lapardha 1, Duhanas, Orizaj and Otllak
- Client
- SH.A. Ujësjellës-Kanalizime Berat-Kuçovë
- Location
- Municipality of Berat, Albania
- Service
- Design
- Period
- September 2020 – December 2020
- Status
- Completed
- Reference no.
- 2020-007
The project
Berat is located in the south of the country, 120 km south of Tirana. The project is divided into four different territorial areas of the Municipality of Berat: Lapardha 1, Orizaj and Otllak (Otllak administrative unit), the village of Duhanas (Velabisht administrative unit) and the Informal Zone in the city of Berat.
The Consultant prepared the implementation design for: the water supply of the village of Lapardha 1, with gravity supply from the new DN200 transmission main 1,500 m long, a secondary line of about 2,388 m, a tertiary line of about 4,704 m and 420 house connections; the water supply of the village of Duhanas, divided into two pressure zones, with a new HDPE DN 110 mm PN 16 transmission main 3,381 m long, a new reservoir V = 200 m³ at an elevation of 180 m, a booster pump Q = 4.2 l/s and H = 52 m, a secondary line of about 4,105 m, a tertiary line of about 5,264 m and 540 house connections; the distribution network for the Orizaj-Otllak area, supplied from the new DN200 main at Kombinat, with three new chambers, a secondary line of about 666 m, a tertiary line of about 8,929 m and 419 house connections; as well as the Informal Zone of the city of Berat, divided into two zones, with the reconstruction of the feeder line over 360 m, a secondary line of 1,606 m, a tertiary line of 3,626 m and 350 m of house connection pipework.
The measures of the project contribute to the sustainable development of the villages by improving the living conditions of the population and reducing the health risk of the inhabitants and visitors.
What we did
SRP Albanian Engineering is responsible for the design of the water supply measures. The implementation design comprises: the Technical Report; the Technical Specifications; the Bill of Quantities; the Cost Estimation; the Technical Drawings; the Environmental Impact Assessment Report.
Your project
Planning something similar?
Tell us where you stand. We will come back with the team and the first steps.
In the same sector

Municipal Infrastructure Programme (MIP) II, phase 3: water supply and sewerage for Lori and Nor Akunq, Armenia
The project concerns the rehabilitation, renewal and extension of the water supply network and urgent measures in the sewer systems…

Wastewater Development Project, Gjilan, Kosovo
The purpose of the project is the collection and treatment of all the wastewater in the urban area of Gjilan…

Preparation of the Feasibility Study for the project “Sewage Disposal in Kosovo I/II”
Within the framework of the bilateral cooperation, the Federal Republic of Germany has committed grant funds of 13.4 million euros…