Skip to content
SRP Albanian Engineering - Konsulence Inxhinierike
  • Home
  • About Us
  • Sectors
    • Water Supply
    • Sewerage
    • Road Infrastructure
    • Structural/Buildings
    • Bridge Engineering
    • Topographic Survey
    • Information Technology
  • Portfolio
  • Jobs
  • News
  • Contact
  • Language: English
    • Shqip Shqip
    • English English
Projektim ITUN nga skuadra e SRP Albanian Engineering
  • Share on Facebook
  • Share on Twitter
  • Share on LinkedIn
  • November 18, 2021
  • Sewerage
  • WWTP, Sewerage, Industrial Building
  • Print
Project Title: Studim Projektim i Rrjetit të Kanalizimeve të Qytetit të Kukësit dhe të Zonave Informale, Bashkia Elbasan
Company

SRP ALBANIAN ENGINEERING

Project Location Project Budget SRPAE Share Involved Staff
Elbasan & Kukes, Albania 22 000 000,00 80 % 12
Employer Name Fund Source Start-End Date Partner
Gjeokonsult & Co shpk AKUM 09/2021 - 10/2021
Project Description

The projects “The Design Study of the Sewerage Network of the City of Kukës and  of Informal Areas, Municipality of Elbasan” aim at the removal of urban wastewater and their disposal in a a clean and hygienic environment according to the standards in force. The main objective of this service is to carry out a Design Study for the construction / reconstruction of Sewerage networks and all its constituent components. The design of sewerage networks should be designed with unfiltered pipes in some areas.

Consulting tasks are divided into 7 phases:

PHASE I – Analysis of the design task / terms of reference and determination of the project basis

PHASE II – Preliminary project-idea

PHASE III – Final project idea

PHASE IV – Projects for the approval of the construction permit

PHASE V – Detailed Designs

PHASE VI – Final Preventions

PHASE VII – Preparation of documentation for the tendering procedures.

The Project aim:

  • The full coverage with sewerage network for the urban wastewater disposal for all project areas.
  • The collector Design for the stormwater disposal in the requrired areas according to the report.
  • Reconstruction & replacement of the sewerage network in depreciated conditions, including Inspection Manholes.
  • Success indicator for program measuring is the 100% connection of the population living in the project area (Direct Outcome) and suistanable standards.
  • The measures include the rehabilitation & construction of water disposal systems and their discharge after treatment according to the Albanian legislation in force for the standards of urban wastewater disposal.

Consultant services:

  • Report and detailed analysis on the separation of the stormwater network from the urban wastewater, identification of needs for urban wastewater disposal on a 20-25 year perspective by studying and analyzing the actual situation of the urban wastewater sewerage network with the updated existing network and ongoing projects being carried out by other institutions.
  • Detailed Designs of all detected areas arising from the situation analysis for the stormwater and urban wastewater disposal.

The WWTP location proposal, as well as drafting the Conceptual Design for the type and technology of WWTP.

Services Provided by the consultand

• Preparation of projects according to phases including hydraulic models, relevant calculations for sewage systems in Kukës with diameter up to DN800 with a length of 32.858 km and in Elbasan with diameter up to DN900 with a length of 34.235 km;
• Preparation of the Conceptual Design for WWTP Kukes;
• Preparation of Environmental Impact Assessment;
• Preparation of structural calculations and structural reports for all components included in the project;
• Preparation of detailed drawings for the works described above;
• Preparation of cost estimates, for the proposed measures according to detailed design;
• Implementation of GIS System.

SRP Network

  • SRP Schneider + Partner – Head Office
  • SRP Schneider + Partner – International
  • SRP – Albanian Branch

SRP AE

  • About Us
  • Contact Us
  • Work With Us

Latest News

Realistic 3d Model for the #Butrinti Archeological Park
Realistic 3d Model for the #Butrinti Archeological Park
Energy efficiency rehabilitation programme student city 1 - Tirana
Energy efficiency rehabilitation programme student city 1 &#…

Kontakti Me Ne

SRP Albanian Engineering
Asocuar me SRP SCHNEIDER & PARTNER
Rr. Tom Plezha, Pll.Klensi, Shk.4, App.2, Yzberisht, Tirane, Shqiperi
+355 48 272 528
© 2023 SRP Albanian Engineering - Konsulence Inxhinierike | Dizenjuar nga Aktiv 21