University Hospital Würzburg; 6. TBM – Development North-East Reconstruction of the Supply and Disposal Lines, Germany

Do you have a project in mind?

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Assignment Name: 

University Hospital Würzburg; 6. TBM – Development North-East Reconstruction of the Supply and Disposal Lines, Germany

Location within Country :

Würzburg, Germany

Name of the Client:

SRP Schneider & Partner Ingenieur Consult GmbH

Professional Staff provided by our Firm:

3 experts

Name of associated Consultants:

N/A

Funding Source:

Periudha e shërbimit:

20191001

Portion of SRP-AE:

Narrative description of Project:

The project includes utility supply channels, starting from the boiler room (Building D.11) and extending to the planned radiotherapy center (formerly C.10). The works that are foreseen are:

  • Reinforced concrete Infrastructure/service structures
  • Excavation works for utilities;
  • Excavation works for electricity supply systems;
  • Reinforced concrete structures (supply channels for power lines / services)
  • Re-planning and reorganization of combined sewers;
  • Dismantling of the water supply network, realization of temporary connections with buildings and re-planning of new water supply lines;
  • Conversion of gas supply network;
  • Excavation works for the whole cable system (temporary configurations and their final extension);
  • Excavation protection;
  • Removal of vegetation (paths, garden landscapes, etc.);

Restore the landscape to its original state using a coating layer, as the alignment and plan of the lines will change

Description of actual services provided by our staff: