- April 17, 2021
- Struktura / Ndertesa
- Structural Design, Spital
Project Title: | Blood Bank Project near St.Vinzenz Hospital, Regensburg | ||
---|---|---|---|
Company |
SRP ALBANIAN ENGINEERING |
||
Project Location | Project Budget | SRPAE Share | Involved Staff |
Regenzburg, Gjermani | - | % | 5 |
Employer Name | Fund Source | Start-End Date | Partner |
BPR Dr. Schäpertöns Consult GmbH | Barmherzige Brüder GmbH | 02/2021 - 03/2021 | |
Project Description | |||
The non-profit hospital GmbH Barmherzige Brüder intends to expand the St. Vinzenz Mitte building on the north side. The blood donation service is to be accommodated in the extension building. In addition, a carport is to be built to the east of the project. The planned new building will be attached to the St. Vinzenz Mitte building to the north. The extension, which is L-shaped in plan, has a north-south extension of approx. 30m and an east-west extension of approx. 35m. The new building will have 2 floors above ground and 1 basement. The building is accessed via 2 staircases and an elevator. Above ground, the building extends to a height of 6.80 m above the ground level. The lower edge of the foundation level will be approx. 5.06m below the ground level. |
|||
Services Provided by the consultand | |||
SRP Albanian Engineering is responsible for drafting the Implementation Project in full compliance with German Design Standards and Eurocodes.The detailed design of the complex contains all the necessary information for the Contractor who will carry out the civil works. Specific services offered: • Sructural design Calculations |